Development History

首页 > About Us > Development History
> In Apr, 2009, Beisteel Pipe (Yingkou) Co., Ltd was founded, covering an area of 440,000 square meters.

 

>In Jun, 2010, the Phase I project of the company, covering an area of 200,000 square meters, was officially put into production. 4 large-diameter SAWH steel pipe production lines and 3 internal & external coating production lines of world’s advanced level were built. The annual capacity of steel pipe can be 600,000 metric tons; and the yearly output of coating can be 8 million square meters.

 

>In Sep. 2010, the Phase I civil engineering project of Beisteel Pipe (Yingkou) Co., Ltd. was entirely completed.

 

>In Oct, 2010, the SAWH steel pipe was officially granted ‘Manufacture License of Special Equipment’ by General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China.

 

> In May, 2011, the company passed the DNV ISO9001/ISO14001/ISO18001 three-system identification.

 

>In Mar, 2012, the construction of wire & rod workshop- Phase II project of Beisteel Pipe (Yingkou) Co., Ltd., was officially started. After project completion, its production capacity will be 1.5 million tons each year.

 

> In Feb, 2014, the Quality Inspection Center went through the laboratory accreditation by China National Accreditation Service for Conformity Assessment.

 

> In July, 2014, the commissioning of converse & longitudinal cutting machine achieved successfully.